Saturday, December 22, 2018
Thursday, December 20, 2018
20181211-12 Quarterly Calibration
Installed vacuum pump on NOy instrument because new one that was installed ceased. (Sergio)
Performed Quarterly Calibration for O3, and CO on 12/11/18 and NOx, NOy on 12/12/18.
Anemometer needs to be rebuild (Sergio)
Performed Quarterly Calibration for O3, and CO on 12/11/18 and NOx, NOy on 12/12/18.
Launch
Trailer Slopes
O3 0.98 (prev. 1.026)
CO 0.85 (prev.
0.85)
NO 0.447 (prev. 0.41)
NOx 0.95 (prev. 0.98)
NOy 1.090 (prev.
1.097)
NOx CE 72.276 (prev. 73.122)
Slope 0.75 (prev. 0.75)
Slope 0.75 (prev. 0.75)
NOy CE 90.73 (prev. 97.93)
Slope 0.91 (Prev. 0.98)
Slope 0.91 (Prev. 0.98)
Anemometer needs to be rebuild (Sergio)
Thursday, December 6, 2018
Subscribe to:
Posts (Atom)